HOME

HISTORY

FACILITIES

BOARD MEMBERS

TBSA
ORGANIZATION CHART

NOTICES OF MEETINGS

AGENDAS & MINUTES

LEGAL NOTICES

REQUEST FOR PROPOSALS

WHAT NOT TO FLUSH

DIRECTIONS

INDUSTRIAL PRETREATMENT
RULES & REGULATIONS

TBSA
FINANCIAL STATEMENTS

 

Contact Us:

P.O. Box 188
Lincoln Park, NJ 07035

973-696-4494 (phone)
973-305-1764 (fax)

Email TBSA at tbsa@ensocorp.net

 

Welcome!

Welcome to the Pequannock, Lincoln Park and Fairfield Sewerage Authority's Website!

Mission Statement

Our mission is to act in the best interests of the public that we serve, to provide for reliable transmission and advanced treatment of wastewater from our regional service area, to assure complete and constant compliance with all State and Federal regulatory requirements, and to do so at the lowest cost to the public that we serve.

Specific Aspects of the Authority Mission are to:

TBSA

The Pequannock, Lincoln Park and Fairfield Sewerage Authority is also known as the "Two Bridges Sewerage Authority" or "TBSA". Located in Lincoln Park, New Jersey, TBSA has been in operation since 1979. The need for this plant came about as the region grew from a sparsely settled rural community into vital suburban communities with increasing populations. As the area grew, it became apparent that there was a need for an adequate sewerage system within the boundaries of Fairfield, Lincoln Park and Pequannock to help resolve severe local septic problems and to replace other smaller, less capable treatment plants.

The Two Bridges Regional Wastewater System serves a 56 square mile area with a current population of approximately 40,000 residents. The TBSA transmission system consists of 14 miles of interceptor sewers, 7 miles of force mains, 5 remote pumping stations and a wastewater treatment facility with an effluent outfall discharging into the Pompton River just upstream of its confluence with the Passaic River.